PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Duct Bank found by Lessner during excavation at the Administration parking lot Pic -1 (800x600).jpg Duct Bank found by Lessner during excavation at the Administration parking lot Pic -2 (800x600).jpg Duct Bank found by Lessner during excavation at the Administration parking lot Pic -3 (800x600).jpg Installing conduit at the bridge by the Administration Building (800x600).jpg Installing shear wall panels at Elev. 1,2,3 (4th Floor) Facing West (800x600).jpg Underground piping for the Tele-Data at the Administration Bldg. parking Pic -1 (800x600).jpg Underground piping for the Tele-Data at the Administration Bldg. parking Pic -2 (800x600).jpg Building rebar mats for Stair -4 (4th Floor) Facing South (800x600).jpg
Previous pageNext page Installing conduit at the bridge by the Administration Building (800x600)
Installing conduit at the bridge by the Administration Building (800x600)